Tolemans Meat & Poultry – Bayside Shopping Centre

Tolemans Meat & Poultry – Bayside Shopping Centre

Retail fit-out in an existing shopping centre including front of house, servery and display cases. Large back of house preparation area built to comply with Prime Safe regulations.

  • Construction
  • Design
  • Fit-out
  • Project Management

Date: September 14, 2017 at 12:47 pm

By:

Posted in:

Blockout – DFO, South Wharf

Blockout - DFO, South Wharf

Keeping in line with the basic nature of the centre, we combined some outrageous paint, 2 pack and wallpaper to make this one really stand out from the crowd.

  • Construction
  • Design
  • Fit-out
  • Project Management

Date: September 14, 2017 at 12:45 pm

By:

Posted in:

Charlie Brown – DFO, South Wharf

Charlie Brown - DFO, South Wharf

Going with the philosophy that the product is the hero, we kept this one simple and understated. A 2 pack & glass shopfront, with minimal finishes inside the shop gave Charlie Brown an elegant and un-interrupted finish.

  • Construction
  • Design
  • Fit-out
  • Project Management

Date: September 14, 2017 at 12:43 pm

By:

Posted in:

Fancy Fillings – Greensborough Plaza

Fancy Fillings - Greensborough Plaza

Sticking closely to the company colours and set out, we created the distinctive front of house with a combination of stone, tiles, 2 pack and timber cladding. The end product is colourful, identifiable, and gives all of the patrons of the busy food court a healthy (and good looking) choice.

  • Construction
  • Design
  • Fit-out
  • Project Management

Date: September 14, 2017 at 12:40 pm

By:

Posted in:

Dan Murphy – Ballarat

Dan Murphy - Ballarat

Although the inside had already been fit out, the outside of the 100+ year old building (originally an Army barrack) was showing its age. We replaced a great deal of rotten timber with matching period mouldings, replaced rotten weatherboards, replaced rusted roof flashings and gutters, and painted the entire exterior of the building in the heritage colours. Following the restoration, we also fabricated & installed the new canopy over the entry – all works carried out overnight to ensure no interruption to Dan Murphy trade.

  • Construction
  • Design
  • Fit-out
  • Project Management

Date: September 14, 2017 at 12:37 pm

By:

Posted in: